Subject: RE: Finally!! Framing is mostly up on the house and we have something to look at!Because of the set-back required from the road we are somewhat limited for the back yard, so not really looking to do an outdoor pool there.
Renee ....... one of the few ways to get off the grid would be to go completely photovoltaic solar. In NC, you might be able to get away with that (good sun angles/location ), but you are also looking at LEAST at $25k to get a system sufficient enough to power everything with a rechargeable generator back-up. It would not be hard to do some type of water recirc. system for the non-potable water and have "green" fixtures.
We have plenty of people in my office who are LEED accredited (US Green Building Council organization and testing ), and once I get off my azz, I will be too.  |